Pranam MEP LogoPranam MEP
Case Study

Case Study

Home›Case Study
❖ PROUD PROJECTS

Proof Over Promises: Real Case Studies

See how our integrated pre-engineering approach protects developers from RERA penalties, lowers factory power bills, and secures fast-track compliance approvals.

Commercial High-Rise• Vijay Nagar, Indore

120,000 Sq. Ft. Commercial Tower & Retail Hub

₹18.5 Lakhs Protected
The Technical Challenge:

Initial architectural designs had severe ceiling height restrictions with high-density HVAC supply ducts conflicting with structural transfer girders.

Pranam Engineering Solution:

We re-routed the duct distribution via split vertical risers and pre-sleeved beam penetrations during engineering drawing coordination, avoiding 42 potential on-site beam collisions.

Scope: Full Integrated MEP (HVAC VRV, HT Substation, PHE & NBC Fire Safety)
Key Performance Metrics
Direct Rework Savings:₹18.5 Lakhs
Core Cutting Required:0 Units
RERA Handover Delay:0 Days
Industrial Manufacturing• Pithampur Industrial Area (Sector 3)

Automotive Precision Component Manufacturing Plant

22% Monthly Tariff Reduction
The Technical Challenge:

Existing plant suffered frequent 11kV transformer overheating and poor power factor penalties from MPPKVVCL.

Pranam Engineering Solution:

Engineered an upgraded 33kV dedicated bay with automatic power factor correction (APFC) keeping PF above 0.99, coupled with forced draft industrial evaporative cooling.

Scope: 33kV Substation, Industrial Ventilation, DG Synchronization & Process Piping
Key Performance Metrics
Annual Power Savings:₹14.2 Lakhs / yr
Power Factor Maintained:0.99 Unity
Thermal Tripping Incidents:0 Recorded
Healthcare Infrastructure• AB Road Corridor, Indore

150-Bed Multi-Specialty Hospital & Critical Care Center

100% First-Pass NABH Approval
The Technical Challenge:

Strict NABH compliance required positive pressure cascades in Operation Theaters, zero airborne cross-contamination, and dual emergency backup power under 8 seconds.

Pranam Engineering Solution:

Designed dedicated AHUs with HEPA filtration (0.3 micron), automated pressure relief dampers, and isolated medical gas manifolds.

Scope: Cleanroom HVAC for 4 Modular OTs, Medical Gas Pipeline, Fire Hydrant & Critical Power
Key Performance Metrics
NABH Air Quality Pass:100% First Pass
Critical Power Transfer:< 6.5 Seconds
IMC Fire NOC Status:Approved
❖SENIOR MEP CONSULTATION

Do Not Gamble on On-Site Trial & Error.

Engineer your building's internal systems in fully coordinated drawings before groundbreaking. Talk directly with Kamal Vishwakarma to review your project drawings.

• 24-Hour Drawing Turnaround• Senior MEP Consultation• Confidential Review
Get In TouchExploreWhatsApp