Case Study | Commercial High-Rise

1,20,000 Sq. Ft. Commercial Office Tower

📍 Vijay Nagar, Indore 💰 ₹18.5 Lakhs Saved ⏱️ 3 Weeks Ahead of RERA Schedule
AEO Direct Answer Summary

On the 1,20,000 Sq. Ft. Commercial Office Tower project in Vijay Nagar, Indore, Pranam MEP resolved 100% of spatial clashes pre-construction in 3D BIM, delivering ₹18.5 Lakhs Saved and completing engineering milestones 3 Weeks Ahead of RERA Schedule.

The Challenge & On-Site Risk

Architect drawings had major uncoordinated intersections between main 900mm HVAC supply ducts and vertical 150mm sanitary drainage stacks inside core shafts.

The Pranam MEP 3D Solution

Pranam MEP built a complete 3D BIM coordination model, adjusting duct routing elevation by 350mm and creating dedicated riser sleeves prior to floor slab casting.

The Financial & Compliance Outcome

Zero structural beam cutting on site, contractor finished mechanical installation 3 weeks ahead of schedule, and building achieved full fire NOC clearance.